Pressure Sewer Installation – Internal Level Control
- 0:08 Step 1 – Identify tank location
- 0:51 Step 2 – Delivery & unpacking
- 1:19 Step 3 – Read manuals & mark tank location
- 2:23 Step 4 – Excavation procedure
- 2:53 Step 5 – Inlet setup
- 3:30 Step 6 – Tank installation
- 4:23 Step 7 – Discharge line & boundary connection kit
- 5:36 Step 8 – Install conduit to control panel
- 6:31 Step 9 – Control panel installation
- 7:51 Step 10a – Internal level control
Pressure Sewer Installation – Level Transducer
- 0:08 Step 1 – Identify tank location
- 0:51 Step 2 – Delivery & unpacking
- 1:19 Step 3 – Read manuals & mark tank location
- 2:23 Step 4 – Excavation procedure
- 2:53 Step 5 – Inlet setup
- 3:30 Step 6 – Tank installation
- 4:23 Step 7 – Discharge line & boundary connection kit
- 5:36 Step 8 – Install conduit to control panel
- 6:31 Step 9 – Control panel installation
- 7:51 Step 10b – Level transducer
Pressure Sewer Installation – Float Tree
- 0:09 Step 1 – Identify tank location
- 0:51 Step 2 – Delivery & unpacking
- 1:20 Step 3 – Read manuals & mark tank location
- 2:24 Step 4 – Excavation procedure
- 2:54 Step 5 – Inlet setup
- 3:31 Step 6 – Tank installation
- 4:23 Step 7 – Discharge line & boundary connection kit
- 5:37 Step 8 – Install conduit to control panel
- 6:32 Step 9 – Control panel installation
- 7:52 Step 10c – Float tree level control